Saturday, January 23, 2010

New Building Progress! :)

Well. For that last couple of months, although I took hundreds of pictures, due to the fact that the framing was being completed, and we had no lights yet, all of the picturs looked basically, exactly the same, and didn't show anything new or different. But the work was coming along nicely, due to our amazing and skilled work crews. It has been beyond words and blessing, all that the Lord has been doing in this amazing process.

Three weeks ago, we learned that we had to be out of our old church offices, within about a week. That was not planned, and was a bit of a surprise, but we all knew it was God moving, and His perfect will and timing, and that He would open the doors. Indeed, that same week, we got a working bathroom finished, and working HVAC (heat) in what will be the new office areas, which was basically nearly move-in ready, and is in a different area than the main body of the church. We did have to finish some walls, paint and put in carpet, so we switched into 'GOD IS MOVING NOW!' gear! ; ) A lot of things moved very quickly! As that area is separate from the Sanctuary, Fellowship Hall, Classrooms etc, we were able to use them, even though the remodel of the church is ongoing. Praise God! :) We continue to have our church services at the school where we've been meeting, and have our mid-week prayer, Youth group, College and Careers and Homefellowships at other locations and homes for now, until we get the Certificate of Occupancy to be able to use the church building. :)

Here are some pictures from the move from our old offices, into the new building area, from two weeks ago! :) If you click on this link, it should take you to the photo album. There will be more posts and pictures coming this weekend, as we have had a LOT happen in the last two weeks! :) God is good, and His will and timing, are perfect... Thank you Lord.

http://www.facebook.com/album.php?aid=137259&id=561089200&l=49ccd8db97

No comments:

Post a Comment